4 research outputs found

    The water cycle and regolith-atmosphere interaction at Gale crater, Mars

    Get PDF
    We perform mesoscale simulations of the water cycle in a region around Gale crater, including the diffusion of water vapour in and out of the regolith, and compare our results with measurements from the REMS instrument on board the Curiosity rover. Simulations are performed at three times of year, and show that diffusion in and out of the regolith and adsorption/desorption needs to be taken into account in order to match the diurnal variation of relative humidity measured by REMS. During the evening and night, local downslope flows transport water vapour down the walls of Gale crater. When including regolith-atmosphere interaction, the amount of vapour reaching the crater floor is reduced (by factors of 2–3 depending on season) due to vapour diffusing into the regolith along the crater walls. The transport of vapour into Gale crater is also affected by the regional katabatic flow over the dichotomy boundary, with the largest flux of vapour into the regolith initially occurring on the northern crater wall, and moving to the southern wall by early morning. Upslope winds during the day transport vapour desorbing and mixing out of the regolith up crater walls, where it can then be transported a few hundred metres into the atmosphere at convergence boundaries. Regolith-atmosphere interaction limits the formation of surface ice by reducing water vapour abundances in the lower atmosphere, though in some seasons ice can still form in the early morning on eastern crater walls. Subsurface ice amounts are small in all seasons, with ice only existing in the upper few millimetres of regolith during the night. The results at Gale crater are representative of the behaviour at other craters in the mesoscale domain

    The ABC130 barrel module prototyping programme for the ATLAS strip tracker

    Full text link
    For the Phase-II Upgrade of the ATLAS Detector, its Inner Detector, consisting of silicon pixel, silicon strip and transition radiation sub-detectors, will be replaced with an all new 100 % silicon tracker, composed of a pixel tracker at inner radii and a strip tracker at outer radii. The future ATLAS strip tracker will include 11,000 silicon sensor modules in the central region (barrel) and 7,000 modules in the forward region (end-caps), which are foreseen to be constructed over a period of 3.5 years. The construction of each module consists of a series of assembly and quality control steps, which were engineered to be identical for all production sites. In order to develop the tooling and procedures for assembly and testing of these modules, two series of major prototyping programs were conducted: an early program using readout chips designed using a 250 nm fabrication process (ABCN-25) and a subsequent program using a follow-up chip set made using 130 nm processing (ABC130 and HCC130 chips). This second generation of readout chips was used for an extensive prototyping program that produced around 100 barrel-type modules and contributed significantly to the development of the final module layout. This paper gives an overview of the components used in ABC130 barrel modules, their assembly procedure and findings resulting from their tests.Comment: 82 pages, 66 figure

    The English Constitution and the Expanding Empire: Sir Edward Coke's British Jurisprudence

    No full text

    The ABC130 barrel module prototyping programme for the ATLAS strip tracker

    No full text
    For the Phase-II Upgrade of the ATLAS Detector [1], its Inner Detector, consisting of silicon pixel, silicon strip and transition radiation sub-detectors, will be replaced with an all new 100% silicon tracker, composed of a pixel tracker at inner radii and a strip tracker at outer radii. The future ATLAS strip tracker will include 11,000 silicon sensor modules in the central region (barrel) and 7,000 modules in the forward region (end-caps), which are foreseen to be constructed over a period of 3.5 years. The construction of each module consists of a series of assembly and quality control steps, which were engineered to be identical for all production sites. In order to develop the tooling and procedures for assembly and testing of these modules, two series of major prototyping programs were conducted: an early program using readout chips designed using a 250 nm fabrication process (ABCN-250) [2,2] and a subsequent program using a follow-up chip set made using 130 nm processing (ABC130 and HCC130 chips). This second generation of readout chips was used for an extensive prototyping program that produced around 100 barrel-type modules and contributed significantly to the development of the final module layout. This paper gives an overview of the components used in ABC130 barrel modules, their assembly procedure and findings resulting from their tests
    corecore